Future Plans

Location

Sellafield Location

Performance Updates

Find out more about LLWR's Performance, visit our Programme Performance Updates section.

See also

NDA Strategy Document

NDA Strategy Document

After extensive consultation with our stakeholders, Government approved our Strategy published on 30 March 2006

NDA Strategy (pdf)

Find more documents in our comprehensive Document Library.

.
Home > Our Sites > LLWR > Future Plans  

Future Plans

This section provides a brief description of the Low Level Waste Repository (LLWR) near Drigg as outlined in the NDA's strategy.

The scope, schedule and cost of work needed to decommission the sites are reviewed annually by the NDA and its contractors during the Lifetime Plan (LTP) review process.


Site End States

 Institutional control following closure of the disposal vaults in 2050. Final closure likely to be determined by radionuclide inventory, not waste volume.

 Year

Milestones 

 2006 Plutonium contaminated materials, (PCM) inventory removal – significant hazard reduction achieved by removal of all PCM items and drums from the site by end December 2006
 2010 Removal of PCM Facilities – decommissioning of all associated PCM facilities (typically magazines, stores and related infrastructure)
 2007 to 2050 Engineered vaults construction – progressive construction and operation of seven new engineered vaults for disposal of LLW, each phased to come on line as required providing total LLW disposal capacity of 1.7 million cubic metres
 2150 Final site clearance and closure